Digital Tools Project Management and HSE for Sustainable Completion of Oil and Gas and Construction Projects
WHEN
28 OCTOBER 2021
WHERE
MS TEAMS
TIME
9.00AM - 5.00PM
RM 350 FOR PROFESSIONALS
10% Discount for Early Bird (until 11 October 2021) / Group / Students
CONTENT SUMMARY
INTRODUCTION
Engineering projects must be constructed physically realizable, economically affordable and environmental friendly. Hence, contractors and engineers must be concerned with the need to acquire knowledge and skill to ensure that the engineering projects will be constructed safely, economically, quality and within the time allocated. This course provides the knowledge for managing the construction of engineering projects successfully with the application of new technology.
2. Basic principle of construction life cycle
3. Introduction to Construction Execution Planning
4. Taking Off / Estimation
5. Project Planning and Scheduling
6. Resource Allocation
7. Site Organization and Management
8. Health and Safety in Construction
9. Nature and types of accidents ; accident theories, safety and health issues on site ; CIDB Act, OSH Act ; main players of site safety ; role of contractors ; safety management techniques and tools.
10. Environmental Management System
11. Construction industry and the environment, Environmental Quality Act, Overview of Environmental Management System (EMS), EMS series of Standard (EMS/ISO14000), the 6 principles of EMS in construction
12. Industrialized Building System (IBS) Construction
13. Definition of IBS, History of IBS, CIDB IBS Grouping, In-situ vs IBS, Advantages and Disadvantages, Buildability of IBS, Barriers for IBS, IBS Floors, IBS score
14. Introduction of digital tools in managing the construction project at worksite
OBJECTIVES
Upon completion of this course, participants will be able to:
WHO SHOULD ATTEND?
1. Dr Ir Idris Othman (UTP)
Dr Idris Othman started of being in the design section about 36 months where he was involved in the project management, planning and design of the high rise buildings and infrastructural works including bridges, roads, drains, treatment plants, sewerage pipes, water pipes for the Penang Development Corporation.
Dr Idris Othman was also involved in the project management, planning and design for the Penang Development Corporation housing scheme; design of treatment plants, internal sanitary and plumbing, road, drain and sewer lines for some building projects included reinforced concrete design also. All of these were done started from planning approval up to the details plan approval from JKR, JPP/ IWK, JPS, Local Authorities, PBA, DOE and other relevant departments.
Simultaneously, Dr Idris Othman was involved in the preparation of tender document; tender, valuation, award processes, site supervision works, and administering the contracts. Ir Dr Idris Othman was also involved in the preparation of tender document and tender drawings for the Penang Development Corporation infrastructure roads, drains, treatment plants, sewerage, water supply, communication and high rise buildings.
Dr Idris Othman total working experiences was more than 16 years consist of project management, site supervision, contract administration, design , planning, tendering works, facilities management and maintenance of commercial and residential inclusive of 65 story KOMTAR Tower according to standard ISO quality practice.
2. Ir. Abd. Rahim B. Bahruddin (PETRONAS PD&T)
Over thirty (30) years of enriching experiences in oil and gas industries including more than 8 years international experience in Joint-Ventures company. Having hands-on experience in Project Management, Mechanical Engineering and EPCC projects ranging from design, contracting, procurement, onshore fabrication, offshore fabrication, retrofit & upgrade, hookup & commissioning and start-up of facilities.
Extensive experience in onshore construction of onshore / offshore plant. Had served as Project Team Leader for Surface Facilities Project for a cumulative of five and half years for GNPOC and Sabah Gas Onshore Gas Terminal Projects. As well as completed two and half years’ task as Company Site Representative for Booster Compression Platform project in Thailand and Myanmar. Worked as Project Manager in Ketapang Oil and Gas Field Development Project, Indonesia.
Developed know-how in planning and execution of EPCC works including construction in life plant area, shutdown and tie-in works onshore and offshore new facilities.
Having opportunities working in various types of projects with people from diverse culture and knowledge (Canadian, Indian, Chinese, Sudanese, Thailand, Myanmar, Indonesia, Turkmenistan, Iraq etc) have prepared me to achieve all standards and expectations to meet the results as required.
3. Nor Arinee Binti Mat Saaud (PETRONAS PD&T)
Over fifteen (15) years of experiences in oil and gas construction industries with 2 different companies. Having hands-on experience in construction, contract management, project management, supply chain , project execution and terminal commissioning.
Experience in planning stage of hook up and commissioning works, initial stage of construction life cyle and handling and managing PC,PCC and EPCIC mode of contract. Hands on experience as focal person for contract management for Onshore and Offshore facilities.
Currently weightage of work inclusive of setting up tools, procedure and guideline for PETRONAS internal use groupwide in managing construction planning, execution and handover. Lead the project audits, assessment of worksites, constructability reviews and value management & improvement processes in various type of project in the company.
*fee quoted does not include SST, GST/VAT or withholding tax (if applicable)
*fee quoted does not include SST, GST/VAT or withholding tax (if applicable)
Centre for Advanced & Professional Education (CAPE)
Level 16, Menara 2,
Menara Kembar Bank Rakyat,
50470, Jalan Travers,
Kuala Lumpur.
+605 - 368 7558 /
+605 - 368 8485
cape@utp.edu.my